Title/Description | Primary Project Manager | Phase | Status | |
---|---|---|---|---|
Building 1512 - Fresh-Air Renewal/Replacement Scope included upgrades to the building’s fresh-air system along with several interior components including, paint, counter top replacements, re-flooring, and bathtub replacements. |
Arzu Yilmaz |
Completed/Warranty |
Inactive |
|
Building 1516 - Student Housing Building 1516 provides double and single rooms with private bath accommodations geared toward non-first-year, undergraduate students. The new dorm recently achieved LEED Gold Certification making it the second UGA building to achieve this status. |
Completed/Warranty |
Inactive |
||
Clark Howell Hall Renovation This project includes the renovation of the existing 33,315 sf Clark Howell Hall to provide improved life safety, mechanical, plumbing and electrical systems, improved ADA accessibility and updated finishes for the students, faculty, and staff within the Career Center, University Testing Services |
Chuck Cartwright |
Completed/Warranty |
Inactive |
|
East Campus Village Housing Opened in Fall 2004, the East Campus Village (ECV) is a complex of four apartment-style residence halls that deliver an unprecedented level of comfort and privacy to over 1,200 students. |
Completed/Warranty |
Inactive |
||
Family Housing Recently renovated buildings feature new appliances, new electrical heating and cooling systems, and video and telecommunications systems. |
Completed/Warranty |
Inactive |
||
Health Center The University Health Center opened in its newest location in 1998. The building provided much-needed space to allow for over 200 employees to provide better care to students. |
Completed/Warranty |
Inactive |
||
Mary Lyndon Hall Renovation Replacement of all HVAC systems, supplemental power to student rooms, the widening of all doorways, and new finishes. Installation of fire sprinklers, elevator and H/C ramps will also be included. |
Completed/Warranty |
Inactive |
||
McWhorter Hall Fresh-Air Renewal and Replacement This project involves the replacement of various interior components, surfaces and the current fresh-air system in the existing residence hall. Renovations include painting, countertop replacement, flooring replacement, and bathtub replacement. |
Arzu Yilmaz |
Completed/Warranty |
Inactive |
|
Morris Hall and Soule Hall Fresh-Air System Both dormitories were outfitted with new chillers and up-to-date, size appropriate air circulation equipment to improve indoor air quality. Soule Hall also received an Energy Recovery unit. |
Arzu Yilmaz |
Completed/Warranty |
Inactive |
|
Myers Hall Renovation and expansion was completed in August 2003. Myers Hall is the magnet residence hall for the University of Georgia Honors Program. |
Completed/Warranty |
Inactive |