Ag Engineering Office and Lab – UGA 4629 (1966, Category 2). The Ag Engineering Office and Lab is a large utilitarian building with a low-pitched gable roof. The principal gable end faces Rainwater Road and features a decorative, concrete block screen wall and wide, overhanging eave. The main body of the structure is a corrugated metal butler building, green in color, with a very low-pitched gable roof. The rear of the building has a two-story garage addition. The west facade has metal walls, windows, and a series of covered car ports. The building retains integrity and is assessed as Category 2.
- F&A Facilities Home
- Home
- Campus Planning
- Campus Maps and GIS
- Design & Construction
- Historic Preservation
- Historic Preservation Master Plan
- UGA HPMP Guiding Principles
- UGA HPMP Categories
- HPMP Actions
- HPMP Standard Operating Procedures
- SOP 1: Campus Preservation Officer
- SOP 2: Consultation and Reporting
- SOP 3: Recordation
- SOP 4: 10-Year Reevaluation
- SOP 5: Excavation and Archaeology
- SOP 6: Historic Resource Studies
- SOP 7: Best Management Practices
- SOP 8: Campus Preservation Officer Consultation
- SOP 9: State Historic Preservation Office (SHPO) Consultation
- SOP 10: Determination of Eligibility
- SOP 11: Assessment of Impact/ Effect
- SOP 12: Demolition
- SOP 13: Mitigation
- SOP 14: Public Hearings
- HPMP Implementation Matrix
- How to Use the HPMP Implementation Matrix
- HPMP Interactive Map
- Athens Campus HPMP Timeline
- Archaeology
- Projects Database
- Athens Galleries
- Griffin Galleries
- Tifton Galleries
- Historic Preservation Master Plan
- Campus Interiors
- Policies
- About OUA
- In the News
- Construction Advisories
- Feedback
- Campus Planning
- Campus Maps and GIS
- Design & Construction
- Historic Preservation
- Historic Preservation Master Plan
- UGA HPMP Guiding Principles
- UGA HPMP Categories
- HPMP Actions
- HPMP Standard Operating Procedures
- SOP 1: Campus Preservation Officer
- SOP 2: Consultation and Reporting
- SOP 3: Recordation
- SOP 4: 10-Year Reevaluation
- SOP 5: Excavation and Archaeology
- SOP 6: Historic Resource Studies
- SOP 7: Best Management Practices
- SOP 8: Campus Preservation Officer Consultation
- SOP 9: State Historic Preservation Office (SHPO) Consultation
- SOP 10: Determination of Eligibility
- SOP 11: Assessment of Impact/ Effect
- SOP 12: Demolition
- SOP 13: Mitigation
- SOP 14: Public Hearings
- HPMP Implementation Matrix
- How to Use the HPMP Implementation Matrix
- HPMP Interactive Map
- Athens Campus HPMP Timeline
- Archaeology
- Projects Database
- Athens Galleries
- Griffin Galleries
- Tifton Galleries
- Historic Preservation Master Plan
- Campus Interiors
- Policies