River Road Sanitary Sewer Rehabilitation This infrastructure project included improvements to the ductile iron pipes and manholes. The sewer lines now operate more effectively and provide better service to the surrounding university properties. |
Completed/Warranty |
Inactive |
||
Rock Eagle 4-H: Belay Course Project to replace the existing ropes/challenge course at Rock Eagle 4-H Center. |
Chuck Cartwright |
Completed/Warranty |
Inactive |
|
Rock Eagle 4-H: Cabins 38-42 Replacement Demolition and replacement of 5 cabins and associated site grading and utility improvements at Rock Eagle 4-H Center. |
Chuck Cartwright |
Completed/Warranty |
Active |
|
Rock Eagle 4-H: Cabins 43-48 Replacement Demolition and replacement of 6 cabins and associated site grading and utility improvements at Rock Eagle 4-H Center. |
Chuck Cartwright |
Completed/Warranty |
Inactive |
|
Rock Eagle 4-H: Dam & Spillway (Combined with Rock Eagle Lake Maintenance Project to provide maintenance / repair existing spillway at Rock Eagle Lake. |
Chuck Cartwright |
Completed/Warranty |
Inactive |
|
Rock Eagle 4-H: Lake Maintenance Lake maintenance project to include dredging lake to remove sediment and restore lake to its original depth and concrete spillway repairs. |
Chuck Cartwright |
Completed/Warranty |
Inactive |
|
Rock Eagle 4H - Sutton Hall Renovation, Phase II The renovation of Sutton Hall converted the two dining areas into assembly areas, the serving lines into reception areas, and an office area into a laundromat and storage space. |
Completed/Warranty |
Inactive |
||
Rock Eagle Cabin Replacement – Cabins 49-54 Demolition and replacement of 6 cabins and associated site grading and utility improvements at Rock Eagle 4-H Center. |
Chuck Cartwright |
Completed/Warranty |
Inactive |
|
Rock Eagle Cabin Replacement – Cabins 7-12 Demolition and replacement of 6 cabins and associated site grading and utility improvements at Rock Eagle 4-H Center. |
Chuck Cartwright |
Completed/Warranty |
Inactive |
|
Rock Eagle Cabins Phase I, 25-29 The Rock Eagle 4-H Center project replaces 51 original cabins constructed in the late 1950s. Phase I includes replacement of cabins 25-29. Cabins will contain 6 rooms to accommodate approximately 22 youths (bunk beds) or 12 adults. They will also include a central meeting room. |