All Projects

Primary tabs

Title/Description Primary Project Manager Phase Status
Baldwin Hall Expansion and Renovation

This $8,750,000 project includes an approximate 15,775sf addition to the 53,200sf Baldwin Hall (1938) to provide classrooms, offices and improved ADA accessibility for the faculty, staff and students within the School of Public and International Affairs (SPIA) and other departments who utilize th

Completed/Warranty
Inactive
Baseball Perimeter Improvements

The Baseball Perimeter Improvement Project includes the renovation of the area behind the existing outfield fence and "Kudzu Hill" beyond the right field fence.

Derek Schuber
Completed/Warranty
Inactive
Baseball Stadium Renovation

The renovation of the Baseball Stadium included the reconstructing and expansion of the press box, raising of the concourse level and expanding the dugout level through excavation. The facility has two club areas; one at the press level and a Dugout Club with seats directly behind home plate.

Derek Schuber
Completed/Warranty
Inactive
Bolton Dining Commons Refresh FY20 (Design Only thru CDs)

Bolton Dining Commons is in need of additional refrigeration to meets the demand of serving over 8,000 meals daily. This project requires re-configuring the under-utilized "Shakes" line to add a walk-in refrigerator and a new collaboration space.

On Hold
Inactive
Bolton Dining Hall

This project will develop a new 67,000 sq food service facility. Construction will include space for an expanded meal plan, operations facility, retail food sales space, catering facilities, and administrative office space.

Completed/Warranty
Inactive
Boyd Golf Center Renovation and Addition
Derek Schuber
Completed/Warranty
Inactive
Boyd Graduate Research Center 1st Floor Renovation

The first floor renovation project within Boyd proposes the renovation of 21,500 sf. This renovation will provide research, office and support space for the College of Engineering’s (CEng) Electrical and Computer Engineering (ECE) MS and PhD programs.

Completed/Warranty
Inactive
Broad Street Studios

When an old futon store and bicycle shop were renovated in 2001, the Broad Street Studios became home to the School of Art's Interior Design program and Undergraduate Drawing and Painting.

Completed/Warranty
Inactive
Brumby Hall Renovation

The project will renovate Brumby Hall and will reconfigure living, bathroom and all programmatic spaces for 938 students. This renovation includes new mechanical, electrical and plumbing systems and providing additional privacy for students in community bathrooms, individual room temperature cont

Arzu Yilmaz
Completed/Warranty
Active
Building 1512 - Fresh-Air Renewal/Replacement

Scope included upgrades to the building’s fresh-air system along with several interior components including, paint, counter top replacements, re-flooring, and bathtub replacements.

Arzu Yilmaz
Completed/Warranty
Inactive

Pages